Skip to main content

Imperial Oil Resources Ltd. - S11L1-004

Type B Water Licence Application for the installation of a new freshwater pipeline between Bear Island and Frenchy’s Island requiring an excavation of approximately 300m of the Mackenzie River bank.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 24 of 24
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S11L1-004 - Water Licence - Jan-12_12.pdf (1.96 MB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S11L1-004 - Staff Report 1 - Application Update - Dec 30_11.pdf (766.66 KB)
S11L1-004 - Application - Additional Info Requested by SLWB-TK Study - Dec 14_11.pdf (131.58 KB)
S11L1-004 - Application - Deemed Complete - Nov 24_11.pdf (37.94 KB)
S11L1-004 - Application map - Nov 8, 2011.pdf (421.98 KB)
S11L1-004 - Application - Nov 08_11.pdf (6.31 MB)
S11L1-004 - Application - Cover Letter - Nov 08_11.pdf (1.17 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S11L1-004 - Summary of Review Comments - Dec 24_11.pdf (88.92 KB)
S11L1-004 - Review Comments from AANDC - Dec 23_11.pdf (324.58 KB)
S11L1-004 - Review Comments from Environment Canada - Dec 20_11.pdf (1.17 MB)
S11L1-004 - Review Comments from DFO - Dec 19_11.pdf (31.41 KB)
S11L1-004 - Review Comments from ENR - Dec 14_11.pdf (88.45 KB)
S11L1-004 - Review Comments from SRRB - Dec 13_11.pdf (32.54 KB)
S11L1-004 - Review Comments from SLUPB - Dec 05_11.pdf (27.94 KB)
S11L1-004 - Request for Review Comments from Distribution List - Nov 28_11.pdf (67.86 KB)
Preliminary Screening
Document Received/Sent Uploaded
S11L1-004 - Preliminary Screening - Jan 02_12.pdf (207.11 KB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S11L1-004 - ENR Letter to the Board Annual Report No Comment - Mar 23_17.pdf (173.69 KB)
S11L1-004 - Annual Report Approval Letter - Apr 05_17.pdf (48.5 KB)
S11L1-004 - 2016 Annual Water Use Report - Mar 03_17.pdf (582.44 KB)
S11L1-004 - 2015 Annual Water Use Report - Mar 24_16.pdf (582.83 KB)
S11L1-004 - 2014 Annual Water Use Report - Mar 31_15.pdf (1.11 MB)
S11L1-004 - Annual Report 2013 - Freshwater Pipeline Installation - Mar 31_14.pdf (2.32 MB)
S11L1-004 - Annual Report 2012 - Freshwater Pipeline Installation - Mar 28_13.pdf (1.76 MB)
Designs and As-Builts
Document Received/Sent Uploaded
S11L1-004 - Freshwater Pipeline Replacement As-Built Drawings - May 30_12.pdf (332.92 KB)